Quek & Quek Civil Engineering Pte Ltd – A1 Civil Engineering Company

Roads And Bridges

We develop creative, comprehensive, and sustainable engineering solutions for a future where society can thrive.

Featured Projects

Project Name 5
Upgrading of Drainage along Airport Boulevard

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Infrastructure Works at Tuas South Avenue 5 and 16
Infrastructure Works at Tuas South Avenue 5 and 16

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Widening of Slip Road from SLE to BKE (PIE)
Widening of Slip Road from SLE to BKE (PIE)

Widen the elevated slip road structure from Seletar Expressway (SLE) to Bukit Timah Expressway (BKE) in the direction of Pan-Island Expressway(PIE) and was completed on 2011

Tampines Viaduct
Tampines Viaduct

Construction of a 2.1 km length vehicular viaduct including ancillary roads and drainage system and was completed on 2003

Project Name 4
Construction of Sentosa Gateway Tunnel Along Sentosa Gateway

Subcontractor works for the structural and demolition of underpass along Sentosa Gateway and was completed on 2016

Vehicular Underpass Across ECP Near Singapore Changi Airport
Vehicular Underpass Across ECP Near Singapore Changi Airport

Completed on 1999 for the construction of a vehicular underpass across main carriage way towards Changi Airport

Construction of Roads, Drains, Service Tunnels at Jurong Island
Construction of Roads, Drains, Service Tunnels at Jurong Island

Construction of roads, drains, sewers, services tunnels, and soil improvement works at Banyan View, Banyan Avenue and Meranti Avenue Jurong Island and was completed from 2010 to 2014

Improvement to Bukit Timah First Diversion Canal
Improvement to Bukit Timah First Diversion Canal

Construction of an additional 3 cell box culvert across Ulu Pandan Road and covered canal transition section upstream and downstream of Ulu Pandan Road. This was completed on 2016

default
ER529 - KJE Interchange

Cutting of existing slope with total of500,000 m3 of earth that to be removed off site and was scheduled to complete by July 2018

AIRPORT BOULEVARD

Year Of Completion:

2022

Project Details:

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Tuas South Avenue 5 and 16

Year Of Completion:

2022

Project Details:

Cutting of existing slope with total of 500,000 m3 of earth that to be removed off site.

SLE to BKE (PIE)

LTA logo

Year Of Completion:

2011

Project Details:

Widen the elevated slip road structure from Seletar Expressway (SLE) to Bukit Timah Expressway (BKE) in the direction of Pan-Island Expressway (PIE).

 

Tampines

LTA logo

Year Of Completion:

2003

Project Details:

Construction of a 2.1 km length vehicular viaduct including ancillary roads and drainage system.

Sentosa Gateway

Sato Kogyo

Year Of Completion:

2016

Project Details:

Subcontractor works for the structural and demolition of underpass along Sentosa Gateway.

Across ECP Near Singapore Changi Airport

Changi

Year Of Completion:

1999

Project Details:

Construction of a vehicular underpass across main carriage way towards Changi Airport.

 

Jurong Island

JTC Logo

Year Of Completion:

2010 – 2014

Project Details:

Construction of roads, drains, sewers, services tunnels, and soil improvement works at Banyan View, Banyan Avenue and Meranti Avenue Jurong Island.

Bukit Timah

pub logo

Year Of Completion:

2016

Project Details:

Construction of an additional 3 cell box culvert across Ulu Pandan Road and covered canal transition section upstream and downstream of Ulu Pandan Road.

Senja/Kranji Expressway (KJE) Interchange, Singapore

LTA logo

Year Of Completion:

2022

Project Details: