Drainage/River Improvement Works

We develop creative, comprehensive, and sustainable engineering solutions for a future where society can thrive.

Featured Projects

Expansion of Changi Water Reclamation Plant
Expansion of Changi Water Reclamation Plant

Construction of Earth Retaining &Stabilizing Structures (ERSS) using sheet piles and king posts, Excavation work sand Installation of bored piles and micro piles. Completed in 2017.

Sungei Sembawang Drainage Scheme
Sungei Sembawang Drainage Scheme

Dredge riverbed & riverbank. Design and Construction of river wall consisting of bored piles with granite stones façade and vehicular bridge across the river and was completed on 2000

Project Name 6
Improvement to Alexandra Canal

Widening of 1km long existing 12mwide canal to 24m wide canal and was completed on 2004

Collector Drain at Changi East Reclamation
Collector Drain at Changi East Reclamation

Construction of a 4.1km length of35m, 40m & 60m wide collector drain including granite blocks pitched outfall structures and a 65m span bridge and was completed on 1996

Construction of Roads, Drains, Service Tunnels at Jurong Island
Construction of Roads, Drains, Service Tunnels at Jurong Island

Construction of roads, drains, sewers, services tunnels, and soil improvement works at Banyan View, Banyan Avenue and Meranti Avenue Jurong Island and was completed from 2010 to 2014

Improvement to Bukit Timah First Diversion Canal
Improvement to Bukit Timah First Diversion Canal

Construction of an additional 3 cell box culvert across Ulu Pandan Road and covered canal transition section upstream and downstream of Ulu Pandan Road. This was completed on 2016

Changi Water Reclamation Plant

pub logo

Year Of Completion:

2017

 

Project Details:

Construction of Earth Retaining & Stabilizing Structures (ERSS) using sheet piles and king posts, Excavation works and Installation of bored piles and micro piles.

Sungei Sembawang

pub logo

Year Of Completion:

2000

Project Details:

Dredge riverbed & riverbank. Design and Construction of river wall consisting of bored piles with granite stones façade and vehicular bridge across the river.

Alexandra Canal

pub logo

Year Of Completion:

2004

Project Details:

Widening of 1km long existing 12m wide canal to 24m wide canal.

CHANGI EAST RECLAMATION

pub logo

Year Of Completion:

1996

Project Details:

Construction of a 4.1km length of 35m, 40m & 60m wide collector drain including granite blocks pitched outfall structures and a 65m span bridge.

Jurong Island

JTC Logo

Year Of Completion:

2010 – 2014

Project Details:

Construction of roads, drains, sewers, services tunnels, and soil improvement works at Banyan View, Banyan Avenue and Meranti Avenue Jurong Island.

Bukit Timah

pub logo

Year Of Completion:

2016

Project Details:

Construction of an additional 3 cell box culvert across Ulu Pandan Road and covered canal transition section upstream and downstream of Ulu Pandan Road.